Faster construction on site by selection of methods and materials
Description
Faster construction on site can contribute significantly to the speed of project delivery. This is achieved through a process of collective decision making by the project team on the selection of construction methods and materials throughout the project process. The guidance gives clear examples and provides a separate section containing case studies. These examples come from direct consultation with the construction industry by means of a questionnaire. The responses were used as a basis for this guide, which will be of relevance to everyone involved in the procurement, design and construction of buildings or engineering structures.